CO129-016 - Sir John Davis - 1846 [1-6] — Page 476

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

of the cold season, but the Regular survey.

and Estimate should be made

sinniltaneously for

the

the detail of them

work to be executed and the permanent: authority for the service.

made

any

As there has not

t yet been

detailed survey of this line of Read, an approximation to the line that it is supposed will be found most practicable and economical has been laid down the Orinance map, Casey of a portion of which with the proposed line marked yellow is hereunto-

is for the

annexed. It is

Que rea400

impossible to give detailed designs for

and Draine,

the several Bridges

but with a view to approximately

the Cost of those works, it is deciding the Cost of those presumed that the description

of Bridges Je, which have been estimated

472

in detail for the Road from Istane to Stanley, Reports and Estimates. At land

2 of 1846. (drawings of which are brevento annexed) will be applicable to the line.

- at present under considérations.

The total length of the line

ie 9250 yards, or very nearly 52. Miles. of which about

about 9.00 yards

Sandy

beach upon

art ove

which this

er flat

Excellency directs ne expenditure to be mode; and 2350 yards upon a Cocky beach and cultivated land which will

probably be formed to a stfeet wide

Read at a Cost of 4 a yard L.1770. 8. E while the demaining 2000 yards being the average... description of sidelying granne

such.

as that on the Road

between überdecu anilécteria

cannot be estimated at less.

Carried forward. £ 470.0.0.